Sub contract for Construction of a 4MW Grid-Connected Solar Power Plant at Busitema University in Busia District, Uganda
Location
Plot 176, Second Sector, City Center, New Cairo, 11835, Egypt
Client
Giza Systems- Egypt
Service
Construction of a 4MW Grid-Connected Solar Power Plant
Status
completed
The project involved the execution of a solar energy installation system, beginning with site preparation and leveling to ensure the area was properly cleared and accurately set out for the solar infrastructure. The works included the construction of strong and durable foundations to support the mounting structures, followed by the installation and precise alignment of photovoltaic mounting systems and solar modules. All associated electrical works were carried out, including cabling, installation of inverters, and integration of grid connection components. The project also incorporated comprehensive grounding, surge protection, and safety measures to ensure system reliability and compliance with standards. Upon completion, the system was successfully commissioned through rigorous testing and subsequently handed over in full compliance with contractual requirements.
Project Gallery